Our skilled asphalt paving and striping divisions serviced Mazda of Orange. This project involved grinding and overlaying 93,248 square feet, totaling 560 tons of asphalt installation. The areas being serviced were the front and back lots. Our crew removed 1" of the existing asphalt and applied a tac coat to help the old asphalt bind to the new asphalt. The new asphalt was compacted to match the 1” thickness of the materials that were removed. The project had to be completed in 3 phases in order to allow the fewest possible interruptions to business and finally applying temporary striping.
The equipment used for this project were, a skid steer, grinder, tracker, roller, rakes, brooms, shovels, dump trucks, striping machine, and compactor. All these tools were expertly handled by our experienced asphalt, concrete, and striping divisions in a safe and clean work environment to provide the highest quality of service.
The work was done correctly, safely, looked great, and all areas were cleaned up and ready for use the following day. The specifics will always depend on the size and assessment of your current situation, but knowing that you will get an honest, upfront estimate from a professional and reputable company equals peace of mind, which is priceless.